» A few figures
• 4000 ongoing contracts
- Engineering contracts for local authorities, every year, totalising :
- • Over 300 000 000 m3 water caught, treated, stored and supplied to users’ taps,
- • Over 200 000 000 m3 wastewater collected, treated and discharged into the environment,
- • Around 500 km drinking water pipes and 400 km wastewater pipes newly installed, extended or renewed,
- • 5 000 000 tons of solid waste collected, sorted, recycled or converted into energy (10 million MWth),
- • More than 15 000 man-days production only for transportation infrastructures and urban development,
- • 1,4 Billion Euro works supervised.